We have been extremely busy the past two weeks working on the house. I was able to find a couple of minutes to update you.
I stained all the trim wood for the house with the exception of some of the baseboard. I am working in the "poker room" in the shop and have filled it up. The baseboard trim is in twenty foot lengths so I can only stain five at a time as that's all that fits on the sawhorses. Once they are dry I stack them, bring in more and stain again.
The hardwood floors are have been in for a couple of weeks. Tanner and his crew will be sanding and finishing them this week. The pictures with hardwood are the master bedroom and Michelle's bedroom. David did a great job, they look super!
The cabinets are slowly being installed. The correct ends arrived about two weeks ago so the island and the bookcase could be installed. After that, David was able to install tile.